TRAFFIC AND POWER BLOCK AT GHATKOPAR STATION ON 23/24.06.2018

Share this News:

Central Railway will operate traffic and power block at Ghatkopar on 23/24.06.2018 (Saturday/Sunday Night) from 00.15 hours to 06.15 hrs. (6.00 hrs) on Up & Dn slow line for launching of girders of New FOB.

Diversion of Suburban Services

All down slow locals leaving Chhatrapati Shivaji Maharaj Terminus from 11.30 pm on 23.06.2018 to 5.28 am on 24.06.2018 will be diverted on Dn fast line between Matunga and Mulund stations. These locals will not halt at Vidyavihar, Kanjur Marg and Nahur stations.

All Up slow locals leaving Thane from 11.49 pm on 23.06.2018 to 6.08 am on 24.06.2018 will be diverted on Up fast line between Mulund and Matunga stations. These locals will not halt at Nahur, Kanjur Marg and Vidyavihar stations.

All Up Mail /Express trains arriving Dadar/Chhatrapati Shivaji Maharaj Terminus during block period will arrive destination 25- 30 minutes late.

All Dn Mail/Express trains towards Igatpuri/Lonavala/Roha leaving during block period will also be handed over 25-30 minutes late.

Passengers are requested to kindly bear with administration for the inconvenience caused. Such blocks are essential for infrastructure provision.